PRODUCTIVITY

Sheet Piling Job Report

RaMeC Side – Grip against 25% – 100% Stronger End – Grip vibrators.

Job report of 800 000 m (2,4 milj. feet) Sheet-Piling job.

RaMeC SGV 90 Exc. mountable vibrator Crane suspensable vibrator
Excavator or Crane Hyundai 330 Hyundai 420 Liebherr crawler crane
Vibration power 97 kW 123kW > 200kW
Measured performance 40 – 50m /hr 20 – 22m / hr 25 – 30m /h
Straightness of the pile very straight problems in “R” direction problems of X,Y,Z and “R” directions
Manpower needed 1 – 2 men 4 – 5 men 4 men
Driving anchors 12m (36f) anchor in 15 minutes – no problem not possible not possible
Fulfilling safety regulations yes very much extra work needed very much extra work needed

 

ANCHORING at 45°